Projects & Case Studies

Before/after proof with real measurements and documented steps.

Before & After Gallery

Real results with documented proof

Before restoration
BEFORE
After restoration
AFTER

Drag the slider to see the transformation

Detailed Case Studies

Kitchen Leak — Miami, FL

Water Damage
Kitchen Leak — Miami, FL
Outcome:

Humidity reduced from 78% to 45% after 48 hours of structured drying.

Process Details:
  • Emergency water extraction within 2 hours
  • Moisture mapping and documentation
  • Industrial dehumidification setup
  • Daily monitoring and dry log maintenance
  • Final clearance and insurance reporting
Duration: 48 hours
Equipment: 6 dehumidifiers, 12 air movers

HVAC Mold — Hallandale, FL

Mold Remediation
HVAC Mold — Hallandale, FL
Outcome:

Containment and HEPA achieved clearance in 72 hours.

Process Details:
  • Immediate containment setup
  • HEPA air filtration installation
  • Safe mold removal and disposal
  • Anti-microbial treatment application
  • Third-party clearance testing
Duration: 72 hours
Area Treated: 850 sq ft

Storm Roof Tarp — Hollywood, FL

Emergency Response
Storm Roof Tarp — Hollywood, FL
Outcome:

Emergency tarping prevented secondary damage before repairs.

Process Details:
  • Emergency response within 1 hour
  • Immediate roof tarping installation
  • Interior water damage assessment
  • Temporary weatherproofing
  • Coordination with roofing contractor
Response Time: 45 minutes
Coverage: 1,200 sq ft roof

Complete Documentation Process

Every step documented for insurance and your peace of mind

Moisture Monitoring

Real-time moisture readings tracked throughout the drying process, providing clear evidence of progress for insurance claims.

Photo Documentation

Day 1
Day 2
Day 3
Final

Comprehensive before, during, and after photography with timestamps and detailed annotations for complete transparency.

Sample Dry Log + Xactimate (PDF)

See exactly what documentation you'll receive with every DMY project

Download Sample Report

Our Proven Process

Every project follows our systematic approach

1
Emergency Response

Within 48 hours of your call, our team is on-site conducting a comprehensive damage assessment.

0-48 hours
2
Damage Mitigation

Immediate steps to prevent further damage, including water extraction, containment, and protective measures.

Day 1-2
3
Professional Restoration

Systematic drying, cleaning, or remediation using industry-leading equipment and techniques.

Day 2-5
4
Quality Verification

Final inspections, clearance testing, and comprehensive documentation for insurance submission.

Final day

Ready to See These Results for Your Property?

Every project receives the same attention to detail and comprehensive documentation.