Projects & Case Studies
Before/after proof with real measurements and documented steps.
Before & After Gallery
Real results with documented proof
Drag the slider to see the transformation
Detailed Case Studies
Kitchen Leak — Miami, FL
Outcome:
Humidity reduced from 78% to 45% after 48 hours of structured drying.
Process Details:
- Emergency water extraction within 2 hours
- Moisture mapping and documentation
- Industrial dehumidification setup
- Daily monitoring and dry log maintenance
- Final clearance and insurance reporting
HVAC Mold — Hallandale, FL
Outcome:
Containment and HEPA achieved clearance in 72 hours.
Process Details:
- Immediate containment setup
- HEPA air filtration installation
- Safe mold removal and disposal
- Anti-microbial treatment application
- Third-party clearance testing
Storm Roof Tarp — Hollywood, FL
Outcome:
Emergency tarping prevented secondary damage before repairs.
Process Details:
- Emergency response within 1 hour
- Immediate roof tarping installation
- Interior water damage assessment
- Temporary weatherproofing
- Coordination with roofing contractor
Complete Documentation Process
Every step documented for insurance and your peace of mind
Moisture Monitoring
Real-time moisture readings tracked throughout the drying process, providing clear evidence of progress for insurance claims.
Photo Documentation
Comprehensive before, during, and after photography with timestamps and detailed annotations for complete transparency.
Sample Dry Log + Xactimate (PDF)
See exactly what documentation you'll receive with every DMY project
Download Sample ReportOur Proven Process
Every project follows our systematic approach
Emergency Response
Within 48 hours of your call, our team is on-site conducting a comprehensive damage assessment.
0-48 hoursDamage Mitigation
Immediate steps to prevent further damage, including water extraction, containment, and protective measures.
Day 1-2Professional Restoration
Systematic drying, cleaning, or remediation using industry-leading equipment and techniques.
Day 2-5Quality Verification
Final inspections, clearance testing, and comprehensive documentation for insurance submission.
Final dayReady to See These Results for Your Property?
Every project receives the same attention to detail and comprehensive documentation.